Salina Elementary School was built in 2004 and is situated on 12 acres.

Under the 2026 transformational bond, Salina Elementary would receive a large additioning creating a preschool through eighth grade Salina School.  This would replace the existing Salina Intermediate. For an overview, see the one-page Salina flyer.

Salina Elementary

A satellite photo showing Salina Elementary was built in 2003

Proposed Salina PK-8 school

An illustration showing the site plan for the Salina Campus including building a multi-story addition onto the existing elementary school.

Phase 1 (Years one to five)

Existing Salina Elementary

New addition to create a preschool to 8th grade building

  • New educational spaces for general and special education
  • Art/music/STEAM/exploratory career labs
  • Separate gyms for elementary and middle school students and a shared gymnatorium for all grades
  • Separate cafeterias for elementary and middle school students
  • Pool with ADA ramp
  • Renovation of 21,500 square foot community center
  • New turf field and walking track
  • Age-appropriate and accessible playgrounds
  • Separate bus loop/drop-off
  • Expanded parking
  • Student support spaces

Phase IV (Years 15 to 20)

Current Salina Elementary portion of the building

  • Major academic space renovations including classrooms, media center, gym
  • Cafeteria and kitchen upgrades
  • Site improvements including parking and playgrounds
  • Major mechanical replacement
  • Building enclosure including roofing, windows, doors
  • Major electrical replacement
  • Major plumbing replacement
  • Elevator replacement

About PK-8 schools  

Creating preschool through eighth grade buildings will allow students and families to form strong bonds while remaining in their neighborhood school for much longer. Elementary and middle school students would be separated for classes, meals, recess, lineup, and dismissal, but all students could use special spaces like STEM labs, music rooms, and gymnasium-auditoriums. An ADA accessible pool would also be included and a turf athletic field. 

Students and families would benefit from staying in the same neighborhood school for up to 10 years – from free GSRP preschool through eighth grade.

Learn more about the 2026 transformational bond on the district website.

An illustration of the separate elementary and middle school wings in a PK-8 school.